Specifications
1. Aerogrid is made of injection molded HDPE plastic and comes with 66 feet of Aerotube aeration tubing attached using stainless steel clamps. The size of this grid is 1m x 1.2m.
Aeration Tubing Technical Specifications:
Air Flow Requirements | Per Grid *One BioCLeaner has 3 Grids |
m3/second | 0.01 |
m3/min | 0.74 |
m3/hour | 44.83 |
l/second | 12.46 |
l/min | 744.99 |
l/hour | 44804.7 |
Ft3/min (CFM) | 26.4 |
Oxygen Transfer | |
Kg O2 per Hour | 1.21 |
Technical information for the aerotubing | |
Outside Diameter | 2.54 cm |
Inside Diameter | 1.27 cm |
Wall Thickness | 0.635 cm |
Optimal Flow | 2.2m3/hr.m or 0.4 cfm |
Operation Preassure | 7kpa or 1PSI |
2. Biotubes are microbial bioreactor made of perforated stainless steel cylinder. It is 3 meters in length and 4 inches in diameter. This Biotubes are filled with “medias” that are full immobilized microbes. Aeration diffusers are also located in the entire length of the Biotubes to provide oxygen to the microbes with 55 watts air blower.
3. Fiber glass angle bar are framings that is 2inch x 2inch x 3mm in size. This is light weight and heavy duty bars that can be submerge in to almost any contaminant water.
4. PE plastic walls are to cover about ¾ of the lift, it is compose of four sheets that is 3.28ft x 2ft x 2mm. This is to provide water direction and suction.
4. PE plastic walls are to cover about ¾ of the lift, it is compose of four sheets that is 3.28ft x 2ft x 2mm. This is to provide water direction and suction.
5. Floaters are made of PE plastic that is 61 inches in length, 12 inches in width and 8 inches in height. This will provide buoyancy to the Biocleaner, making it mobile and use less power.
6. Air Blower is a single phase motor, that uses 1.75kW of power. This motor will transport 240m3 air/hr. Approximately 3.65 kg O2/hr are transferred in to the surrounding water.
DOs and DON’Ts for Maximum Efficiency:
- Ring blower/pump should be turned on 24 hours a day.
- Do not throw any chemicals to waste stream. (Chlorine, etc.)
- Do not reassemble the BioCleaner unit.
- Check for loose hoses regularly.
- Make sure that BioCleaners face one direction to maximize flow
- Check Aerogrid and Bioplug status every three (3) years.
- Make sure there is space between the BioCleaner and the waste-water pond walls
No comments:
Post a Comment